Community Budget Issue Requests - Tracking Id #3359
Erosion Control Measures for Bishop Creek at Rainbow Farms
 
Requester: Kimberley O. Tracy, P.E. Organization: City of Safety Harbor
 
Project Title: Erosion Control Measures for Bishop Creek at Rainbow Farms Date Submitted 1/13/2006 4:40:08 PM
 
Sponsors: Berfield
 
Statewide Interest:
The project will address water quality from a tributary of Tampa Bay. By reducing the erosion to the creek banks, the amount of sediment reaching the Bay should be reduced.
 
Recipient: City of Safety Harbor   Contact: Kimberley O. Tracy, P.E.  
  750 Main Street   Contact Phone: (727) 724-1555  
  Safety Harbor 34695   Contact email: ktracy@cityofsafetyharbor.com
 
Counties: Pinellas
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
Construction of erosion control measures (to be determined in design phase currently being performed) along Bishop Creek at Rainbow Farms to reduce further erosion.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Project is anticipated to reduce sediments into Tampa Bay as well as protect property/structures along the creek.
 
Amount requested from the State for this project this year: $500,000
 
Total cost of the project: $1,000,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $500,000  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Safety Harbor Stormwater Master Plan and Bishop Creek Erosion Control Study.
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Safety Harbor City Commission
  Hearing Meeting Date: 11/07/2005
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Has the project been submitted to the Department of Environmental Protection? No
Is this project eligible under section 403.885(5) F.S.? Yes
 
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
Safety Harbor Stormwater Master Plan, pages 70-74.
 
If you are requesting funding for a stormwater or surface water restoration project:
 
Which Water Management District has the jurisdiction of your project?
  Southwest Florida Water Management District
Have you provided at least 50% match? Yes
  Match Amount: 500000
  Match Source: Safety Harbor/SWFWMD
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Tampa Bay
 
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
Existing Bishop Creek cross sections will be widened and planted with native plants for the entire improved cross sections. This will result in reduced stream velocities and sediment loads, and increase pollutant (N,P,others) uptake.
 
If you are requesting funding for a wastewater project:
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Other wastewater projects:
 
Have you received previous legislative funding for this project? No
 
Is the project under construction? No
 
Have you provided at least a 25% local match? No